First Light FCU Foster NM

About the Project

The UCHealth Memorial Hospital Central (MHC) 5th and 6th Floor 40-Bed Buildout was completed in two phases.Phase one included the renovation of 7,500 SF of office space and 12,500 SF of medical record storage space in the Memorial Administrative Center (MAC) building in order to allow Phase 2 to begin. MAC updates included installing upgraded IT computer room air conditioning equipment, modifying the security access system, installing new wall protection and raising the MEP systems location.

Phase two encompassed a 33,000 SF renovation of the 5th and 6th floors in the MHC East Tower. The existing shell space on the 5th floor was renovated to hold 20 private acute care beds and support space. Half of the acute care patient rooms are equipped with patient lifts and both floors were designed to have five isolation rooms per floor. Hospital support spaces included nurse stations, medical staff rooms, dictation rooms, staff lounges, public restrooms, IT, electrical rooms and waiting rooms.

QUICK FACTS

Location

522 E Idaho Ave, Las Cruces, New Mexico 88011

Client

First Light Federal Credit Union

Architect

DRAXIS 3 LLC

Industry

Finance

Line of Business

Credit Union

Delivery Method

Civil Site Development

Completion Date

October 15th, 2024

Duration

6 Months

Contract Value

--- --- ----

Square Footage

58,123 Sqft

Related Projects

UCHealth Memorial Hospital Central 5th and 6th Floor 40-Bed Buildout

Pellicano

12295 Pellicano, El Paso, Tx 79936

Northloop

8100 Northloop Dr El Paso, Tx 79907

Riverside High School

Ysleta Independent School District