U.S Customs Port Of Entry Del Rio

About the Project

The UCHealth Memorial Hospital Central (MHC) 5th and 6th Floor 40-Bed Buildout was completed in two phases.Phase one included the renovation of 7,500 SF of office space and 12,500 SF of medical record storage space in the Memorial Administrative Center (MAC) building in order to allow Phase 2 to begin. MAC updates included installing upgraded IT computer room air conditioning equipment, modifying the security access system, installing new wall protection and raising the MEP systems location.

Phase two encompassed a 33,000 SF renovation of the 5th and 6th floors in the MHC East Tower. The existing shell space on the 5th floor was renovated to hold 20 private acute care beds and support space. Half of the acute care patient rooms are equipped with patient lifts and both floors were designed to have five isolation rooms per floor. Hospital support spaces included nurse stations, medical staff rooms, dictation rooms, staff lounges, public restrooms, IT, electrical rooms and waiting rooms.

QUICK FACTS

Location

3140 SH-239 Spur, Del Rio, Tx 78840

Client

U.S Customs & Border Protection Del Rio

Architect

Atmosphere Architects

Industry

Federal Government

Line of Business

Border Protection

Delivery Method

Low Energy Portal Block / Drive through system

Completion Date

March 20th, 2024

Duration

6 Months

Contract Value

--- --- ----

Square Footage

219,826

Related Projects

UCHealth Memorial Hospital Central 5th and 6th Floor 40-Bed Buildout

Pellicano

12295 Pellicano, El Paso, Tx 79936

Northloop

8100 Northloop Dr El Paso, Tx 79907

Riverside High School

Ysleta Independent School District