The UCHealth Memorial Hospital Central (MHC) 5th and 6th Floor 40-Bed Buildout was completed in two phases.Phase one included the renovation of 7,500 SF of office space and 12,500 SF of medical record storage space in the Memorial Administrative Center (MAC) building in order to allow Phase 2 to begin. MAC updates included installing upgraded IT computer room air conditioning equipment, modifying the security access system, installing new wall protection and raising the MEP systems location.
Phase two encompassed a 33,000 SF renovation of the 5th and 6th floors in the MHC East Tower. The existing shell space on the 5th floor was renovated to hold 20 private acute care beds and support space. Half of the acute care patient rooms are equipped with patient lifts and both floors were designed to have five isolation rooms per floor. Hospital support spaces included nurse stations, medical staff rooms, dictation rooms, staff lounges, public restrooms, IT, electrical rooms and waiting rooms.
QUICK FACTS
Location
12295 Pellicano bldg C, El Paso, TX 79936
Client
AMEX Properties
Architect
Retail Trade
Industry
Retail Trade
Line of Business
Retail Center
Delivery Method
Turn Key
Completion Date
July 3rd, 2024
Duration
1 Year 4 Months
Contract Value
--- --- ----
Square Footage
4,047 sqft
Related Projects
UCHealth Memorial Hospital Central 5th and 6th Floor 40-Bed Buildout